TRENTO. A white area, another yellow area and a red area are intended to make the ring road closure accessible and accessible San Vincenzo and the car parks with connecting shuttles. The preparations for the Maxi Event in Trento continue with the preparation of the site and the development of the logistical and organizational aspects for the forecast of an influx of 120,000 people.
That mobility plan was central to a summit between the province with theCouncilor Roberto FailoniI Manager of the various services egg representatives of economic categories to outline the measures and measures in the days concerned Vasco Rossi concertwith special reference to the requirements of entrepreneurial activities.
The local police chief Pierangelo Vescovi With Mauro Eccelexplained that from 8 of Wednesday May 18th will be set up a white surfacewith traffic restrictions from the roundabout via Mach – via dei Viticoltori to via Pomeranos – way of cooperation in Mattarello.
From 6 Thursday May 19th will be set up a yellow area areawith provisions limiting the circulation of via della Cooperation in Mattarello in via Menguzzatoduring Friday May 20th one will be set up red zone until palace. There will be local police checks to verify that the different areas have access to the authorized people (residents, those going to work or school, shopkeepers and those going to commercial activities and public facilities in the area).
Furthermore Friday May 20th Public transport on Via San Vincenzo in Mattarello is guaranteed until 8 a.m., after which it is closed until the early hours of Saturday morning. Reach rolling pin Alternative routes will be available for private vehicles, such as provincial road 90. Vescovi pointed this out Mobility restrictions lead to surveillance of the affected area to prevent forms of unauthorized trespassing and parking or unauthorized appearances of itinerant trade.
The chief inspector also recalled the closure of the ring road: it will be closed in both directions between exit 2 (Marinai d’Italia roundabout) and exit 3 (Ravina) on May 19 after 12 noon; The ring road will reopen from Friday, May 20 until around 8:30 in the early hours of the morning and will then be closed again until the morning of Saturday, May 21. In this case, the road is blocked from the Ponte di Ravina south of Mattarello.
The Director General of the Ministry of Land and Transport, Environment, Energy, Cooperation, Roberto Andreatta, stressed that the IT tool for booking the parking spaces identified for the event will be available shortly. There are also the planned expansion of rail transport to facilitate post-show drainage.
The Director General of Civil Protection, Raffaele de Colmade clear the size of the area and emphasized the attention it was given security theme. During the meeting, the possibility of mobility with bicycles and motorcycles was also discussed. It was also the standpoint on parking and connecting shuttles. It was explained that there are connections with the car parks in the direction Territory east of Trentowith the Valsugana – with terminus in Viale Rovereto in Trento, but also heading north – with terminus in the area of Piazza Fiera – and in the west, a Riva del Garda – with a terminus in the field of civil motorization.